Connection inquiries and grid capacity

Please note that determining the connection feasibility also requires checking the transmission possibilities of the transmission system operator, Fingrid Oyj, which may affect the processing time and the realization of the connection. Additionally, EPV Alueverkko performs its own simulation regarding the connection’s effects on its electricity network, and a decision on the potential realization of the connection will be made based on these results.

EPV Alueverkko Capacity Map Service

In the EPV Alueverkko capacity map service, you can view the national location and technical data of the company’s networks. The map service can be utilized, for example, when preparing new connection inquiries.

The map includes details such as:

  • Location of substations and power lines
  • Substation type
  • Status (whether the substation or power line is in use)
  • Available consumption and production capacity (MW)

The map service can be opened in a new browser window here.

Privacy Overview
EPA

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

Analytics

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.